Dear Experts,
For a project we are currently developing new dataflows in SAP DataServices 4.2, using ODP objects.
These ODP objects all point to relevant BW datasources, which we made available via table ROOSATTR.
At the moment we have included several dataflows into a single workflow, without connecting them.
This means that all dataflows are triggered in parallel and thus triggering a mass load on the SAP ECC source system via background processes.
Is there a way to limit the number of SAP ECC background processes that can be used simultaneously by ODP / DataServices, or should we just connect the dataflows to serialize the processing?
In the attached file the dataflows are shown. The tests show us that during a period of 1 minute a total of 41 background tasks are triggered over a total of 7 batch processes.
Thanks in advance!
Best regards,
Steven Groot